Planning & scheduling
Critical path built to be used, not filed. Logic that survives contact with the site.
Project controls / Est. 2005
Planning, cost engineering and risk analysis for infrastructure, energy and mining programmes.
Early warning
Each activity is a few days behind. None of them on its own justifies a phone call. Together they bend the curve, and the bend is the signal — months before anything is visible in the field.
Plan Actual
Four disciplines that only work when they run off the same set of numbers.
Critical path built to be used, not filed. Logic that survives contact with the site.
Estimate through to forecast, with the trail intact from one to the other.
Quantified rather than assumed, so contingency has a number behind it.
Earned value reporting that shows the slip early enough to act on it.
Capital programmes where one week of float is worth real money.
Technology moves in two-to-three-year cycles. Generation and grid do not. The gap between those two clocks is where the programme risk now sits.
28 Aug 2026US production is running behind last year while metallurgical benchmarks sit well above it. Divergence like that changes sequencing, strip ratio and cash profile at the same time.
24 Aug 2026Compressing the permitting front end does not shorten the critical path. It moves the pressure downstream, onto the schedule.
21 Aug 2026