Project controls / Est. 2005

Twenty years of schedules that held.

Planning, cost engineering and risk analysis for infrastructure, energy and mining programmes.

20+ years On capital programmes
Three Sectors: infrastructure, energy, mining
One Baseline for cost, schedule and risk

Early warning

The slip shows on the curve before it shows on site.

Each activity is a few days behind. None of them on its own justifies a phone call. Together they bend the curve, and the bend is the signal — months before anything is visible in the field.

Plan Actual

ELEVEN WEEKS CUMULATIVE PROGRESS

Cost, schedule and risk on one baseline.

Four disciplines that only work when they run off the same set of numbers.

CRITICAL PATH FLOAT
1.0

Planning & scheduling

Critical path built to be used, not filed. Logic that survives contact with the site.

ESTIMATE SCOPE RATES RISK FORECAST
2.0

Cost engineering

Estimate through to forecast, with the trail intact from one to the other.

P50 P80 ← CONTINGENCY
3.0

Risk analysis

Quantified rather than assumed, so contingency has a number behind it.

EARNED SPENT PLANNED
4.0

Delivery assurance

Earned value reporting that shows the slip early enough to act on it.

Where the work happens

Capital programmes where one week of float is worth real money.

Infrastructure Rail, roads, water
Energy Generation, transmission
Mining Shaft to plant

Sector notes

All notes

A project drifting off baseline? Start with the numbers.